Click to return home Click to return home
Residential TabCommercial/Industrial tab
navbar

About OPU
What's New
Commission Minutes
Water Quality
Peak Alert
Natural Gas Outlook
Valuable Links
ClearWave High Speed
   Wireless Internet
Wind Power
Rates
Forms
Email OPU
Site Map
Home



Info on New Construction Services
For Commercial Electric Customers

Temporary Electric Service

Service to any electrical installation for a period of less than 3 years shall be considered as "temporary electric service".

Temporary electric service is available provided the customer pays a fee for installing and removing the facilities required to provide the requested service.

The fee for temporary service shall include all installation and removal costs in accordance with the rates shown below plus any non-recoverable material costs.

RATES
1. Standard 120/240 volt single-phase electric service connected directly from existing permanent electrical facilities. (no spans, poles, transformer) $ 50.00
2. Install and remove secondary span. $100.00
3. Install and remove secondary pole & secondary span. $200.00
4. Install and remove single phase transformer. $200.00
5. Install and remove secondary span, pole & single phase transformer. $400.00
6. Temporary service requiring additional construction not covered in items 1-5. Contact OPU
Engineering

All above charges are subject to applicable State and City sales taxes.


Service and Connection Fees

The electric service and connection fees are to be charged for the connection of a new electrical service to the distribution system of the Owatonna Public Utilities. This applies to all services, whether overhead or underground, made inside or outside the city limits of Owatonna. The connection fee is to cover, in part, the installation of overhead or underground 12.5 kV, 7.2 kV, 4kV, or 2.4 kV distribution systems. The service fee is to cover, in part, the installation of an individual service. The service line to the point of service is owned and maintained by O.P.U..

RATE

Overhead Connection Fee - $125.00

Underground Connection Fee - $275.00

Cost for Underground Service Installation - $225.00

Cost for Overhead Service Installation - $125.00

NOTE: On underground the customer provides ditching, conduit and backfilling of ditch as per OPU specifications.

NOTE: There may be additional fees depending on the individual circumstances - call OPU Engineering for details 451-2480.

All above charges are subject to applicable State and City sales taxes.



Back to Top




Please read the Owatonna Public Utilities (OPU) site terms of use (last modified 04/03/2000) before using this site. By using this site, you signify your consent to these terms. If you do not agree with the terms, please do not use this site. You may call (507) 451-2480 for terms clarifications or to request information.
Owatonna Public Utilities
P.O. Box 800
Owatonna, MN 55060-0800
Phone: 1-507-451-2480
Fax: 1-507-451-4940


Web Weaver: VoyageurWeb
Gas Water Before You Dig Moving In/Out Your Bill Saftey Customer Programs Electric Click to return home Click to return home